New solar panel plant up and running

Since 2023 summer the new solar panel plant is up and running at DMINOX facility.
This investiment is representative of another step the company made about energy saving, together with a near full-electric machine fleet (expecially inside bending departement).

Since 2019, before the new 5.0 Transition Plan wolud have set this as a foundamental requirement, DMINOX have installed a specific platform to detect electric energy consumption.
Thanks to this tool, in combination with on-the-field measurement systems, is possibile to visualize the energy adsorbtion of departments and single machines at every time.
These informations are used both for monitoring and decision-making purposes.